
Brokk 500+
When it comes to power, more is more, and the Brokk 500+ is the true embodiment of unmatched demolition power
Read moreRead less
Powered by a state-of-the art electrical powertrain, the new Brokk 500+ boasts a robust design, exceptional power and outstanding reach, dominating the industry. Cutting-edge technology and an innovative operator support system for better communication between the operator and the robot enhance the operating experience.
Technical Specifications
Expand All| Hydraulic breaker in illustrations. Load and stability diagram available on request. | BHB 705 |
|---|
Performance
| Slewing speed | 16 sec/360° |
|---|---|
| Transport speed, max. | 1.8 km/h; 1.1 mph |
| Climbing inclination, max. | 30° |
Hydraulic system
| Hydraulic system capacity | 145 l; 38 US gal |
|---|---|
| Pump type | Variable load-sensing |
| System pressure | 18 MPa; 2611 psi |
| Increased pressure to attachment | 24 MPa; 3481 psi |
| Pump flow 50Hz | 115 l/min; 30 US gal/min |
| Pump flow 60Hz | 130 l/min; 34 US gal/min |
Power system
Control system
| Control unit | Portable |
|---|---|
| Signal code | Digital |
| Transfer | Professional radio/Cable |
| Range, radio | Up to 300 m |
Weight
| Machine weight** | 5200 kg; 11,464 lbs |
|---|---|
| Recommended attachment weight | 700 kg; 1543 lbs |
Noise level
| Sound power level LWA*** | 100 dB(A) |
|---|
Dimensions
| Width min | 1600 mm; 63 in |
|---|---|
| Height min | 1677 mm; 66 in |
| V reach incl breaker | 7300 mm; 287 in |
| H reach incl breaker | 7000 mm; 276 in |
Excluding options and attachment
Measured according to directive 2000/14/EC, excl. attachment
Where the 500+ works
-
Kiln and preheater maintenance in heat
Cement
-
Stairwells, floor slabs and interior strip-outs
Construction
-
Furnace relining and taphole work in residual heat
Metal Processing
-
Scaling, secondary breaking and ore pass clearing
Mining
-
Decommissioning cells with no human access
Nuclear
-
Scaling and profiling where the heading is too tight for a rig
Tunnelling
Attachments for Brokk 500+
500+ on the job
All cases-
Cuatro Torres Complex
At Madrid's Cuatro Torres complex, Perfox carried out demolition work as part of the new Caleido Tower project — in the middle of the city's financial district. Six Brokk machines, including two Brokk 500s and two Brokk 180s, played a key role on site.
View project -
Fossil-Free Mine
Grecian Magnesite set out to build a fossil-free operation at the Koutzi underground mine — without explosives. A Brokk 500 with the BHB705 breaker enabled selective rock removal and remote control, paving the way for all-electric mining with lower emissions.
View project
Brokk 500+
Interested in the Brokk 500+? Contact us
Tell us a little about your work and we will connect you with the right Brokk dealer for your country and industry.














