Brokk 200+
The newest generation Brokk 200+ defies its size by accommodating heavier tools to outperform any competition
Read moreRead less
With added smart sensors and a sophisticated operator support system relaying updates in real-time, the Brokk 200+ provides added intelligence and unmatched power-to-size ratio. The newest generation Brokk 200+ defies its size by accommodating heavy attachments, outperforming any competition.
Technical Specifications
Expand All| Hydraulic breaker in illustrations. Load and stability diagram available on request. | BHB 305 |
|---|
Performance
| Slewing speed | 10 sec/360° |
|---|---|
| Transport speed, max. | 2.1 km/h; 1.3 mph |
| Climbing inclination, max. | 30° |
Hydraulic system
| Hydraulic system capacity | 85 l; 22.5 US gal |
|---|---|
| Pump type | Variable load-sensing |
| System pressure | 18 MPa; 2611 psi |
| System pressure, increased to attachment, max. | 23 MPa; 3336 psi |
| Pump flow 50Hz | 85 l/min; 22.5 US gal/min |
| Pump flow 60Hz | 102 l/min; 27 US gal/min |
Power system
Control system
| Control unit | Portable |
|---|---|
| Signal code | Digital |
| Transfer | Professional radio/Cable |
| Range, radio | Up to 300 m |
Weight
| Machine weight** | 2100 kg; 4630 lbs |
|---|---|
| Recommended max. attachment weight | 350 kg; 772 lbs |
Noise level
| Sound power level LWA*** | 87 dB(A) |
|---|
Dimensions
| Width min | 780 mm; 30.7 in |
|---|---|
| Height min | 1351 mm; 53.2 in |
| V reach incl breaker | 5450 mm; 215 in |
| H reach incl breaker | 5100 mm; 201 in |
Excluding options and attachment
Measured according to directive 2000/14/EC, excl. attachment
Where the 200+ works
-
Kiln and preheater maintenance in heat
Cement
-
Stairwells, floor slabs and interior strip-outs
Construction
-
Furnace relining and taphole work in residual heat
Metal Processing
-
Scaling, secondary breaking and ore pass clearing
Mining
-
Decommissioning cells with no human access
Nuclear
-
Scaling and profiling where the heading is too tight for a rig
Tunnelling
Attachments for Brokk 200+
200+ on the job
All cases-
Pile Driving
In the basement of Gothenburg's historic Draken building, Grundia AB had to drive new foundation piles through passages narrower than 800 mm. A Brokk 200 with a hydraulic breaker brought the necessary power in a compact, emission-free package, working efficiently across multiple cramped levels.
View project -
Tunnel Widening
Diamond Drilling SRL had just one month to remove huge volumes of concrete and granite from a Bulgarian tunnel — in winter, with limited space. A Brokk 200 and a Brokk 520D delivered the demolition safely and on schedule.
View project
Brokk 200+
Interested in the Brokk 200+? Contact us
Tell us a little about your work and we will connect you with the right Brokk dealer for your country and industry.