Ågesta Nuclear Plant
At the Ågesta nuclear plant in Sweden, Vattenfall was responsible for dismantling radiation-exposed concrete structures under strict safety requirements and with limited access.
The project required a high level of precision while minimising human exposure in a complex and hazardous environment.
A Brokk 300, equipped with specialised tool BGS65, enabled the controlled and precise removal of contaminated materials, allowing operators to work remotely while maintaining full control throughout the process.