Ågesta Nuclear Plant

At the Ågesta nuclear plant in Sweden, Vattenfall was responsible for dismantling radiation-exposed concrete structures under strict safety requirements and with limited access.

The project required a high level of precision while minimizing human exposure in a complex and hazardous environment.

A Brokk 300, equipped with specialized tool BGS65, enabled the controlled and precise removal of contaminated materials, allowing operators to work remotely while maintaining full control throughout the process.

Photos © Vattenfall

See More Projects

Tunnel Widening

View Project
Tunnel Widening — main photo

Vacuum Excavation

View Project
Vacuum Excavation — main photo

Cuatro Torres Complex

View Project
Cuatro Torres Complex — photo 3

Descaling Philippines

View Project
Descaling Philippines — main photo

Ågesta Nuclear Plant

Have a similar project? Let's talk

Tell us a little about your work and we will connect you with the right Brokk dealer for your country and industry.