LKAB Malmberget

A Brokk 800 replaced traditional blasting with consistent mechanical demolition, removing safety risks while keeping the crushing line moving.

At the Malmberget iron ore mine in Sweden, LKAB had to break down oversized boulders before they reached the crushers, 1,250 meters below ground, in a confined environment.

Traditional blasting methods were time-consuming, costly, and posed safety risks. A Brokk 800 replaced explosives with mechanical demolition, allowing operators to manage oversize material more consistently and keep the crushing process moving.

Read the full story

See More Projects

Fossil-Free Mine

View Project
Fossil-Free Mine — main photo

Vacuum Excavation

View Project
Vacuum Excavation — main photo

Tunnel Widening

View Project
Tunnel Widening — main photo

Cuatro Torres Complex

View Project
Cuatro Torres Complex — photo 3

LKAB Malmberget

Have a similar project? Let's talk

Tell us a little about your work and we will connect you with the right Brokk dealer for your country and industry.